Rates & Charges

2026 Rate Schedules
Schedule A – Farm & Residential Service (1/1/26)

Available to Farm, Home, and Community buildings for all uses, subject to the established rules and regulations of the Cooperative. Single phase at available secondary voltages. 3-phase service is available at the option of the Cooperative.

Monthly Billing Rates:

Monthly Service Charge (200 amp & below)$33
(201 to 400 amps)$40
(401 to 600 amps)$47
Charge per kilowatthour for all kwh$0.0912
Demand Charge per KW$0.40
Surplus generation credit for all reverse-metered
kilowatthours **$0.04798

Note: Customer class is determined by the amperage rating of the customer’s service entrance equipment. Amperages in excess of these amounts will be extrapolated.

Schedule GS – General Services (1/1/26)

Available to non-farming businesses and commercial enterprises, schools, and any other non-residential service (not covered in Schedule A) requiring up to 100 kVA of transformer capacity, for all uses subject to the established rules and regulations of the Cooperative. Single phase at available secondary voltages. 3-phase service is available at the option of the Cooperative. Demand shall be based on rolling demand.

Monthly Billing Rates:

Monthly Service Charge (200 amp and below)$34
(201 - 400 amps) $41
(401 - 600 amps)$48
Charge per kilowatt-hour for all kwh$.0916
Demand Charge 0-20 KW$0.40 per kw
Demand Charge on peak over 20kw**$6.75 per kw

Note: Customer class is determined by the amperage rating of the customer’s service entrance equipment. Amperages in excess of these amounts will be extrapolated.

Schedule LP – Large Power & Lighting Service (1/1/26)

Available to all farm, industrial, business, commercial, and public service enterprises requiring large load 3-phase service for all uses, subject to the established rules and regulations of the Cooperative. 3-phase, 60-cycle, AC at available secondary voltages. Minimum charges shall be based upon $1/kVA unless set by contract. Demand charge is based on rolling 15-minute demand.

Monthly Billing Rates:

Monthly Service Charge$80
Demand Charge on peak over 25 KW$7.25
Energy Charge: Per kilowatt-hour$0.083

Power Factor Adjustment: Demand charges will be adjusted to correct for an average power factor lower than 95%. Such adjustments will be made by increasing the measured demand by 1% for each 1% that the average power factor is less than 95%.

Schedule I – Agricultural Irrigation Service (1/1/26)

Available for power on a continuous basis for agricultural irrigation pumping from April 1st to October 31st, inclusive.  Service may be available for the balance of the year without any additional horsepower charge at the option of the Cooperative.  The dates April 1st to October 31st, inclusive, shall be considered the irrigation season.  Alternating current, three phase, 60 cycle at available secondary voltage.  At the discretion of the Cooperative, single phase service may be furnished provided motor capacity is not in excess of 20 hp.  Minimum charges shall be Annual Horsepower Charge.

Billing Rates:

Annual Horsepower Charge (min 10hp)$16
Monthly Energy Charge: per kilowatt-hour$.092

Note: AHP Charge is based on pump nameplate rating and will be billed in 3 installments of 1/3 of total annual charge during the operating season.

Schedule N-M /FR – Farm & Residential Service (1/1/26)

Available to Farm, Home, and Community buildings for all uses, subject to the established rules and regulations of the Cooperative. Single phase at available secondary voltages. Interconnected, consumer-owned, qualifying generation not greater than 50 kW capacity. 3-phase service is available at the option of the Cooperative.

Monthly Billing Rates:

Monthly Service Charge (200 amp & below)$33
(201 to 400 amps)$40
(401 to 600 amps)$47
Charge per kilowatthour for all kwh$0.0912
Demand Charge per KW$0.40
Surplus generation credit for all reverse-metered
kilowatthours **$0.04798

**Any reverse-metered generation as of the closing reading of any month will be credited to the consumer’s bill in accordance with the above calculation. The reverse metered rate is being established by the cooperative’s avoided cost of power, excluding transmission charges, based upon the combined annual average of the cooperative’s effective wholesale rate contracts.

A credit balance greater than $100 remaining after all charges and credits have been applied to the twelfth month of an annual period may be paid by check to the member at the discretion of the Cooperative.

Credit will not be applied for reverse-metered generation that is based upon estimated readings.

Schedule N-M/GS – General Service (1/1/26)

Available to Non-Farming businesses and commercial enterprises, schools, and any other non-residential service (not covered in Sch.A) requiring up to 100 kVA of transformer capacity, for all uses subject to the established rules and regulations of the Cooperative. Single phase at available secondary voltages. 3-phase service is available at the option of the Cooperative. Demand is based on a rolling demand.

Monthly Service Charge (200 amp and below)$34
(201 to 400 amps)$41
(401 to 600 amps)$48
Charge per kilowatt hour for first 2,800kwh$0.0916
Demand Charge 0-20 KW$0.40 per kw
Demand Charge on peak over 20kw*$6.75 per kw
Surplus generation credit for all reverse-metered
kilowatthours **$ 0.04798

**Any reverse-metered generation as of the closing reading of any month will be credited to the consumer’s bill in accordance with the above calculation. The reverse metered rate is being established by the cooperative’s avoided cost of power, excluding transmission charges, based upon the combined annual average of the cooperative’s effective wholesale rate contracts.

A credit balance greater than $100.00 remaining after all charges and credits have been applied to the twelfth month of an annual period may be paid by check to the member at the discretion of the Cooperative.

Credit will not be applied for reverse-metered generation that is based upon estimated readings.

What is the Monthly Service Charge?

The monthly service charge for residential and general service members starting January 1st, 2026, will rise to $33 per month for basic services.

What is the monthly service charge?

The monthly service charge that Idaho County Light & Power (ICL&P) members pay covers part of the fixed costs of bringing electricity to their location, regardless of how much electricity is used. We are a not-for-profit electric cooperative and work to ensure that each member pays his/her fair share, whether you use a lot of power or a little, use power for all 12 months of the year or for only 3 to 6 months.

This charge helps recover such things as:

  • Having you connected to the electric grid to be able to use power as needed.
  • Trucks, wire, transformers, meters, and power poles are needed to build and maintain the electric distribution system.
  • The cost of insurance, interest, and property taxes.
  • Pole Inspections and tree trimming
  • Certain operating, members services, and administrative costs

Our cost-of-service study shows that we would need to charge nearly $70 per month for each meter, and then we could sell power at just above cost. However, that amount is not feasible to charge each member, so we collect roughly 42% of our fixed costs through the monthly service charge, and the rest of the needed fixed costs are built into the kilowatt-hour (kWh) or usage charges. If we didn’t have a monthly service charge, many seasonal and very low usage members would pay a much lower cost for power, and full-time members would have to pay a lot more.

Because all cooperative members benefit from having reliable electric service available when they need it, the monthly service charge allows everyone to pay a share of the basic costs. In other utilities, the charge is also called a system access fee, a monthly base rate, etc.

Members sometimes ask why ICL&P's monthly service charge is higher than neighboring electric utilities like Avista, which is currently at $20 per month. It's because of our low member density; ICL&P serves an average of 4 members per mile of line. Compare this to a city or town where the average density is easily more than 30 customers per mile of line. However, ICL&P's average rates remain competitive with those of neighboring utilities. In Northern Idaho, our monthly service charge is comparable to many of our neighboring cooperatives, including Clearwater Power, which charges $38 per month, Kootenai Electric, which is at $32.50, and Northern Lights Electric and Missoula Electric, which are currently at $30 per month.

ICL&P serves a diverse membership. Some of our members use a lot of electricity all year long, and some may use a small amount of electricity for only 1 or 2 months per year. Whether you use a lot or a little, the cost of getting electric power to your location remains the same and that is why your electric bill has 2 separate charges: the monthly service charge to cover part of the basic costs, and the per kWh charge to collect the remaining fixed costs and cover the cost of power for the actual amount of electricity consumed.

We hope this brief explanation helps answer your questions about the service charge portion of your electric bill. Please call us if you have any billing questions.

What is Demand?

Residential Demand Charges

Starting January 1, 2026, ICL&P will begin applying a demand charge of $0.40 per kilowatt (kW) to residential accounts. The average residential member typically peaks at 7-8 kW of demand over the course of a month.

What Is Demand?

Demand is the rate at which electricity is used at any given moment, measured in kilowatts (kW). It differs from energy consumption, which is measured in kilowatt-hours (kWh) and reflects the total electricity used over time.

High demand occurs when multiple appliances or devices operate simultaneously.  For example, running your oven, dryer, electric heaters, dishwasher and water heater all at once.

Demand vs. Consumption – A Simple Analogy

Think of your home’s electricity use like filling a bucket:

  • Energy Consumption (kWh) = The total amount of water used to fill the bucket.
  • Demand (kW) = How wide you opened the faucet—how fast the water was flowing.

Why Are We Introducing a Demand Charge?

  • Demand charges aren’t new. They have always been embedded in ICL&P’s energy rates as we are billed for demand/KW from our power supplier. Historically, our power bill from the Bonneville Power Administration has made up about 20% of our power bill and was included in the kWh rate. Starting in 2026, those costs are rising to 30–40% of our monthly power costs, prompting us to separate it out as a distinct line item.
  • This change ensures fairness—members with lower demand won’t be subsidizing those with higher peak usage. It also aligns with industry trends toward three-part billing structures: energy usage, demand, and a fixed monthly facility charge—just like how BPA bills us.

Why Is Demand Important?

Demand matters for a few reasons. It determines the size and strength of the electrical infrastructure needed to serve your home and community. Even if your high usage only lasts a few minutes, the system must be built to handle that peak.

Here’s why it’s critical:

  • System Design: Utilities must size transformers, substations, and lines to meet peak demand, not average usage.
  • Cost Drivers: Roughly 30–40% of ICL&P’s monthly bill from Bonneville Power Administration (BPA) is based on demand.
  • Grid Reliability: High demand periods stress the grid. Spreading out usage helps maintain stability and avoid outages.

How does ICL&P measure demand?

ICL&P measures demand in 15-minute intervals via the meter.  The highest KW recorded sets member’s billed demand for that billing cycle.  Demand is reset at the start of each billing cycle.

Who Benefits From This Change?

Members who avoid using multiple high-energy appliances at the same time will benefit most. As a member-owned cooperative, our mission is simple: to provide safe, reliable, and affordable power, while treating all members fairly.

By encouraging smarter energy habits, we can reduce system strain and lower costs for everyone. When we all use less energy at once, we all save.

Tips to Manage Your Demand

  • Stagger appliance use: Run your dishwasher after your dryer finishes.
  • Use timers or smart plugs to schedule devices during off-peak hours.
  • Upgrade to energy-efficient appliances that use less power and reduce peak load.
  • Avoid “all-on” mornings: Heating, cooking, and laundry all at once can spike demand.

Fee Policies

The following are found in the “Rules and Regulations of Idaho County Light & Power Cooperative”.

Membership Fee - $5: Each consumer requesting electric service is required to become a member of the cooperative. Upon termination of service, the membership fee is applied to the final bill, or if the account is paid in full, is refunded to the member. Each member is required to sign a membership card. Failure to sign and return the membership card can result in discontinuance of service.

Security Deposit – Residential/$150; General Services/$300; Large Power $300 or 2 times the average monthly usage; Irrigation/equal to HP charge. All accounts are required to pay a deposit unless an acceptable credit reference is obtained. Deposits are held for a period of at least 1 year. If payment history is good or the service is terminated, the deposit is refunded to the member. Accounts disconnected for non-payment will be charged a deposit of the greater of $150 or 2 times the average monthly usage. For each additional disconnect in a 24-month period, $100 will be added to the deposit requirement. Note: The cooperative’s By-laws do not allow interest paid on any deposit.

Reconnect Fee - $75: A reconnect fee is required when a member or a new consumer requests that an existing, but idle, service or security light, be connected during regular office hours. For a remote reconnect, not requiring a serviceman on site, the reconnect fee would be $50. Members requesting a reconnection within 12 months of requesting a disconnection at the same service location shall be responsible for paying all applicable charges that would have been incurred during the months the service was disconnected.

Non-Payment of Bill - An additional $50 plus the $75 reconnect fee will be assessed when service has been disconnected for non-payment and reconnection is made during regular office hours.

Transfer Fee - A $15 fee is required when we transfer an account. Confirmation and approval of both parties are required.

Notification Fee - $20: A notice will be issued for any account with a balance over 35 days past due.

Collection Fee - $25: A collections fee will be assessed if ICL&P personnel must be dispatched to collect a past due bill.

Returned Check Fee - $20: This fee will be assessed for any check that is returned by the bank on which it is drawn due to non-sufficient funds. 2 NSF returns in one 12-month period will require all payments to be made in cash until sufficient credit rating has been re-established.

Unpaid Balance Fee – 1.5% or $5 per month, whichever is greater: This fee will be assessed on all balances that are past the required due date. Balances are due by the 20th of the month following the date of the statement.

Meter Tampering - $500: This fee will be charged in addition to estimated lost revenues plus the actual costs incurred due to the investigation of meter tampering and/or power theft, as well as any other applicable fees or charges due under these policies.

Rewards – up to $1,000: The Cooperative will pay a reward of up to $1,000 to any person or persons furnishing information and testimony leading to the arrest and conviction of any person or persons stealing power or vandalizing equipment or property belonging to Idaho County Light & Power Cooperative.