Underground Power Installation

UNDERGROUND POWER INSTALLATION GUIDELINES

Transformer • Junction Box • Pole Service

ALWAYS CALL 811 BEFORE YOU DIG!

 

Conduit & Sweep Requirements

  • Conduit sweep must be 6–8 inches away from the pole.
  • When installing conduit into an existing energized transformer or junction box:
    • Keep the trench 3 feet away.
    • Leave the conduit sweep for the lineman to install.
  • All URD sweeps must have a minimum 36-inch radius.
    • Smaller sweeps will not allow cable to be pulled properly.

Conduit Sizes

Primary

  • 2″ Schedule 40 PVC

Secondary

  • 200-amp service: 2″ Schedule 40 PVC
  • 400-amp service: 3″ Schedule 40 PVC

Trench Depth Requirements

Primary

  • 38-inch trench depth
  • 36 inches minimum cover

Secondary

  • 26-inch trench depth
  • 24 inches minimum cover

Warning Tape

Install Red “Danger” Warning Tape halfway between the conduit and finished grade.

  • Primary: 18 inches below grade
  • Secondary: 12 inches below grade

Transformer & Junction Box Installation

  • Conduit sweeps entering transformers or junction boxes must be:
    • Tight together
    • Securely taped together
  • New transformer and junction box locations must be backfilled with:
    • ¾-inch Minus Road Mix
    • Required for ICLP Fiberglass Basements

Pull String Required

Every conduit must contain a heavy-duty bailing twine pull string to verify the conduit is clear and unobstructed.

⚠️ No pull string = Linemen will leave the job.

Protect Your Conduit

Cap all conduit sweeps and open conduit ends to prevent entry of:

  • Water
  • Dirt
  • Debris
  • Rodents or other obstructions

Before Power Can Be Pulled

  • All trenches must be completely backfilled.
  • Bedding material is only required in rocky conditions.
    • Use ¾-inch Minus Road Mix.

FOLLOW THESE REQUIREMENTS TO PREVENT DELAYS & FAILED INSPECTIONS

Safety First • Quality Work • Proper Installation